Pipeline municipal lining trolley advantages
1.Short construction period
Compared with the traditional bakelite formwork and the aluminum alloy formwork, the mold is removed, the walking and the supporting form are only used for one day, the roof steel bar is tied and poured for one day, and the maintenance is carried out for three days. The normal construction can reach the standard section of a pipe gallery for five days.
2.Saving labor
Pipeline municipal lining trolley construction method is replaced by manual mechanization instead of manual removal and assembly. The standard bakelite mold and aluminum alloy formwork require 40 workers for formwork and shelf work. Only 10 of them are used. Workers, labor costs are reduced by 75%.
3.The labor intensity of workers is greatly reduced and the safety is higher
Pipeline municipal lining trolley is automatically driven by the hydraulic dismantling mold. Workers only need to screw the bolts, and the labor intensity is reduced by 80%. The aging of construction workers has changed the way young people are unwilling to engage in the construction industry because of the “dirty, tired, poor working environment” of the construction industry.
4.Comprehensive benefits are obvious
Pipeline municipal lining trolley adopts the overall large steel mold, the outer mold is hoisted as a whole, and no external scaffolding is needed. It can reduce the width of the excavation section, reduce a large number of excavation and backfilling earthwork, and save the cost of erecting external scaffolding. The benefit is very obvious.