No. Model Product Categories Material Size Unit of measurement Delivery cycle
Supply Capacity
(can be based on days/weeks/months/quarters/years)
1 Single-track railway lining trolley Tunnel lining formwork Steel structure 12m、9m、6m、4+4m、6+6m and so on Ton 30 to 35 days 15,000 tons / year
2 Double-track railway lining trolley Ton
3 Two-lane highway lining trolley Ton
4 Three-lane highway lining trolley Ton
5 Pipeline municipal lining trolley Ton
6 Water conservancy and hydropower lining trolley Ton
7 Subway lining trolley Ton
8 Tunnel waterproof board laying formwork Tunnel waterproof board laying formwork 6.8m、6mand so on Set
Set
9 Wheeled  Hydraulic inverting bridge formwork Hydraulic inverting bridge formwork 16m、24m、 Ton
Crawler Hydraulic inverting bridge formwork Ton
10 Tunnel formwork channel Tunnel formwork channel 12m Set
11 Tunnel concrete maintenance formwork Tunnel concrete maintenance formwork   Set
12  travel system Tunnel equipment accessories  
13 Hydraulic system
14 Hydraulic cylinder
15 Screw
16 Electric motor
17 reducer
18 Lining trolley plug steel template Tunnel lining trolley accessories  
19 Concrete diversion groove
20 Automatic Concrete Distribution Device
21 Grouting with mold