The tunnel inverted arch trestle plays a crucial role in tunneling projects by providing a temporary support structure for construction activities.
The tunnel invert arch trestle is designed with a modular structure, allowing for quick assembly and disassembly. This design facilitates easy transportation to the construction site. The trestle is typically made of steel beams and plates, providing high strength and stability.
Before erection, the foundation is cleaned and leveled. The odolites and spirit levels are used to ensure accurate positioning and alignment. The trestle is assembled on-site and positioned using cranes. The main bridge section is formed by welding longitudinal and cross beams, providing a robust structure.
The trestle operates using a hydraulic system, which allows for flexible movement and precise control. It can move longitudinally and laterally using drive motors and lifting cylinders. The hydraulic system also enables the trestle to adjust its height and position according to the tunnel’s geometry.
The trestle provides support for the invert arch construction. It allows for excavation, reinforcement binding, and concrete pouring without obstructing other construction activities. The trestle can be moved forward or backward as needed, ensuring continuous construction progress.
Gaofei
Address: 200m east of tulip garden, group 12 of zhangling community, hongshan street office, hongshan town, xigong district, Luoyang
Tel: +8616638856888
Contact: Gaofei Huang
Mobile: +86-18637923976
Phone: 0379-80881719/ 0379-60162687
QQ: 286827457
E-mail: gaofei@gf-bridge-tunnel.com